2011年10月24日星期一

Moncler Sale South East Suining Phase two stations cleaning machine equipment procurement and instal

Posted :2011-08-24
South East Suining Phase two stations cleaning machine equipment procurement and installation standards Standard Tender Notice Information Content: 1. South Eastern tender conditions the first phase of the project Suining two station project approved by the state construction funds for construction have been implemented, works with the tender conditions. South East Water project legal Co., Ltd. Jiangsu agency commissioned by the tender agent Co., Ltd. Jiangsu Hongyuan bidding, construction clean-up of the standard machine equipment procurement and installation for domestic public tender. 2. Project Overview 2.1 Project Overview and scope of the tender Suining pumping station project is the hub of North Water Transfer Project first five pumping stations, located in Suining County, Xuzhou City, Jiangsu Province, Xu Ben sand within the town line, and stop by the Suining two stations Suining, Suining a station was built in 1993. The new station project Suining two main construction contents are: a new pump station, design flow 60m3 / s, install vertical mixed flow pump is a diffuser type 4 sets (sets of equipment with a machine), stand-alone design flow of 20.0m3 / s , Motor Power 3000kW, the total installed power 12000kW; downstream irrigation channel excavation, clean-up machine of new sites under the bridge, approach roads (about 2.0km), cross-traffic entering Xu Shahe Bridge (bridge width 7.0 +2 × 0.5, the bridge across the 1 × 50m +2 × 28.5m reinforced concrete box girder, pile foundation), management facilities and Suining a transformer station, cleaning machine facility conversion and so on. Static total investment projects approved 240.85 million yuan, the total duration of 30 months approved. Project was started in March 2011. 3. 3.1 Suining leg of the tender range renovation project (1) HQ-5.0m × 14.5m (hole width × hole high) rotary cleaning machine 5 sets and their corresponding hinge, embedded parts, locks, and spare parts spare parts and special tools; (2) 1m wide conveyor belt and a corresponding set of spare parts, spare parts and special tools; (3) cleaning machine, conveyor belt scene control equipment; (4) Suining a Station removal of the original clean-up machine; (5) Suining stop cleaning machine installation. 3.2 Suining two station project (1) HQ4.2m × 9.5m (width × hole-hole) rotary cleaning machine 6 sets and their corresponding hinge, embedded parts, locks, and spare parts and special tools; (2) 1m wide conveyor belt level of a set and its corresponding parts, spare parts and special tools; (3) cleaning machine, conveyor belt scene control equipment; (4) two stations cleaning machine Suining installation. After winning bidder is responsible for clean-up of the two pumping equipment design, manufacturing, factory testing, factory inspection, packaging, insurance, transportation loading site, installation and commissioning and after-sales service, to provide spare parts and special tools; submit drawings, specifications, and other technical information; take appropriate design liaison; accept the tender on behalf of the participating factory supervision, plant inspection and factory acceptance; responsible for the cleaning machine commissioning and acceptance, all pumping stations in the commissioning and acceptance; provide operation and maintenance staff training; complete the coordination of contract work. 4. Qualification requirements of bidders for the bidder should have the Administration of Quality Supervision, Inspection and Quarantine issued a cleaning machine or clean-up equipment production license (medium or above), and the permit holder during the last 3 years (2008 to the present) have medium-sized hydropower project clean-up equipment, pumping station or the production, manufacture, an independent legal entity operating experience. Qualification after the trial-qualification form. 5. Bidder's bid must be filed by the Jiangsu Province Water Diversion Project Construction Leading Group Office of the record (record time: 9:00 to 11:30,14:30 to 17:30). South Jiangsu Province, bidding forms and filing instructions please go to the record South Jiangsu network bulletin boards to download (http://www.jsnsbd.gov.cn/WebMain/shouye/ztb.aspx) (Tel: 025-86577275,86577267). 6. Tender documents, please meet the above eligibility requirements and intends to participate in the bidding of the bidders to send the unit staff (agent) a copy of business license, legal representative of the power of attorney, the production license, permit, during the last 3 years ( 2008-present) with medium-sized hydropower project clean-up equipment, pumping station or the production, manufacturing, operating experience documents, bidding for the record confirmation and an agent ID, agent of the recent old-age insurance payment proof information (more than required to produce for examination the originals, provide a copy), on August 29, 2011 to September 2,Moncler Sale, 2011 (Beijing, following the same), daily from 8:30 to 11:30,15:00 to 18:00 to tender Jiangsu Hongyuan Co., Ltd. (Nanjing Qinhuai District sluice Road 3rd Floor, No. 32) to register and purchase the tender documents. Tender documents price is RMB one thousand yuan / sets, IFB. 7. Media announcement of the tender announcement while in the ), 8. Contact tender: South Eastern Jiangsu Water Co., Ltd. Address: Nanjing Road, Shanghai No. 5, Postal Code: 210029 tender site management agencies: South Suining, Jiangsu Province,Moncler Sale, construction of two stations at the address : Sand Town, Suining County, Xuzhou City, Sand collection station hospital management agency tender: the tender, Jiangsu Hongyuan Co., Ltd. Address: Nanjing Road, No. 32 sluice Qinhuai District 3 Contact: Zhang Hua Ding CHEN Tel :025 -52302706025- 8657722813305161122 Fax :025-52302707
Related articles:

没有评论:

发表评论