2011年10月24日星期一

UGG Online Outlet Water Engineering Consulting Co., Ltd. Guangxi Guiping City, Huang Jiang Town, est

Posted :2011-08-18
Water Engineering Consulting Co., Ltd. Guangxi Guiping City, Huang Jiang Town, estuary restoration project of the construction tender documents to add change notifications (b ) Standard hearing body : the bidder : The study of Guiping Huang Jiang town, a large estuary restoration project ( bid No. : GSZB-GG2011001) construction tender documents for the following additional changes: 1 , the original project bid closing and opening time ( at 9:00 on August 15, 2011 pm) is replaced by at 9:00 on September 5, 2011 , when ; pay deposit tender prior to tender closing time is 2 working days , ie September 1, 2011 ~ 2 . 2 ,UGG Online Outlet, the project start date changed : September 15, 2011 , planned completion date changed : March 15, 2012 , the total duration unchanged. 3 , the construction bidding ceiling price of 3,066,838.57 yuan , details see 4 , reference to the construction cost of 2,698,817.94 yuan . Purchased the tender documents are invited to tender units from the date of issuance of this Circular , to purchase the tender documents with the original receipt issued to the Water Engineering Consulting Co.,UGG Online Outlet, Ltd. Guangxi Guigang Branch (Tel :0775 -4266918 ) to receive this notice and the upper limit of the construction tender control the price , if not to receive , be deemed to have received queries on the relevant website . Tenderer: Guiping Water Conservancy Bureau August 18, 2011
Related articles:

没有评论:

发表评论